click or scroll to view project

Altona North Primary School

The design of this classroom building draws upon existing spaces and surroundings to explore a story of context, legacy and change.

  • Design Response

    The first of a 4-stage transformation, conversations about new spaces were always in relation to what the school enjoyed and disliked about the buildings they had. We saw this as an opportunity to explore the design potential of such hesitancy; reconfiguring the architecture of the existing Light Timber Construction (LTC) classroom to address its pedagogic limitations and monotonous extrusion.
    Six classrooms, their arrangement slightly slipped, form diagonal connections across a central corridor via sliding doors. Together and apart; this combination provided the flexibility and control that the school desired. For the central corridor – part time out, break out, group and IT learning space, another mediation is required; a combination of space, materials and light gives an overlay of calm.
    The school wanted the new building to capture its legacy; a campus that began with the suburb that surrounds it, at a time when its original homes were being replaced with higher densities of apartments and townhouses.
    In response, we transformed the LTC’s deadpan section and elevation into a civic narrative on this evolving context. Segmenting and turning the LTC cross section 90 degrees to create a roof that references the factory sawtooths for which Altona North was a dormitory suburb.
    Benwetah this veil-like roof, glazed brick fringing derived from the decorations of surrounding houses identify the entries to each classroom. Linking each of these figures is brickwork from Altona North’s demolished homes, returned from a Tottenham brickyard and re-laid in strata-like layers, evoking both a geology of redevelopment and a prosaic process of re-use; when one house runs out, another starts.
    During the day the brickwork is concealed behind perforated metal sun-shading to the classroom interiors, into evening the figuration gives way to reveal patterns of softly back- lit brickwork.

     

  • Services Provided

    • Full Services

    Architect

    Workshop Architecture

    People

    Project Director: Simon Whibley
    Project Team: William Heath, Jacqueline Tang
    Photographer: John Gollings

    Date completed

    December 2021

    Location

    Bunurong Country / Altona North

Related projects

				
Built - imaginarily - from a variety of industrial components, reassembled to deliver flexible and intimate spaces that celebrate the once industrial area.
Newcomb Park Primary School

Built - imaginarily - from a variety of industrial components, reassembled to deliver flexible and intimate spaces that celebrate the once industrial area.

View project

Combining new teaching and collaboration spaces to complement existing teaching spaces to form a contemporary STEM teaching facility.
Diamond Valley College

Combining new teaching and collaboration spaces to complement existing teaching spaces to form a contemporary STEM teaching facility.

View project

Celebrating the original heritage building on the campus whilst acknowledging an awakening awareness of local indigenous culture.
Stawell Secondary College

Celebrating the original heritage building on the campus whilst acknowledging an awakening awareness of local indigenous culture.

View project


Drawing out Burrinja Cultural Centre’s diverse and socially connected qualities, visual arts activities are bound together and brought to the foreground of a visitor’s experience.
Burrinja Cultural Centre

Drawing out Burrinja Cultural Centre’s diverse and socially connected qualities, visual arts activities are bound together and brought to the foreground of a visitor’s experience.

View project

A small project of significant impact, existing library, service and outdoor spaces were transformed into a dynamic learning facility for STEM and Art.
Spensley Street Primary School

A small project of significant impact, existing library, service and outdoor spaces were transformed into a dynamic learning facility for STEM and Art.

View project

Reinventing the existing primary school in response to contemporary needs in a growing area with great ethnic diversity and significant social disadvantage.
Melton West Primary School

Reinventing the existing primary school in response to contemporary needs in a growing area with great ethnic diversity and significant social disadvantage.

View project


A small but important piece of public infrastructure - makes its presence felt within Mernda's evolving commercial precinct.
Mernda Ambulance Station

A small but important piece of public infrastructure, making its presence felt within the evolving commercial precinct of Mernda.

View project

Myrtleford Jubilee Park
Myrtleford Jubilee Park

Ties together existing and new elements within Myrtleford’s Jubilee Park creating axis and intersections that drive the geometry of new structures.

View project

Sorrento Visitor Centre
Sorrento Visitor Centre

A combination of urban design, sculpture and architecture creating new spaces for the public life of Sorrento.

View project